commercial · 2023

Osborne Park Warehouse — Mezzanine & Stairs

Operational mezzanine for a 3PL warehouse expansion in Osborne Park. Dual egress stairs, load-rated decking, and fall-protection balustrading.

Osborne Park Warehouse — Mezzanine & Stairs
Client type
commercial
Scale
380m² mezzanine + egress stairs
Material
Mild steel, AS/NZS 5131 CC3
Year
2023

Scope

380m² mezzanine designed and fabricated to engineer specification (5 kPa UDL), with two egress staircases and perimeter balustrading. Installed over a Christmas shutdown.

Constraints

Warehouse couldn’t lose receiving capacity during construction. Mezzanine footprint had to leave three loading bays operational throughout install.

Outcome

Structure erected in 9 days with phased bay access. Load-test certification issued before handover. 3PL reopened full receiving 3 January without delay.

Working on something similar?

Send us your drawings, specs or a rough brief — quote back within 2 business days.